Our scope of work included the installation of over 7,000 metres of phenolic pipe section to the pipework services, 3,000 m² of duct wrap to the ductwork, and 400 m² of external Therma duct board, along with electrical trace heating for the external pipework. Leveraging our expertise, we delivered bespoke, high-performance insulation solutions tailored to the building’s technical requirements, enhancing energy efficiency, system reliability, and overall operational longevity.